Information hidden
Contact information
Current address
Personal Information
Desired position
Desired work location
Special requirements
About me (introduction)
SPECIAL competence:
• Dam construction using temporary structures Climbing System Formwork with PERI SB Frame, PERI SCS 250, Doka D3 and scaffolding Doka D22.
• Structural design in RC (Rebar & GFRP bar)/STEEL Structure & Strengthening/Rehabilitation with CFRP wrap technique.
• High rise building analysis and design.
• Geopolymer concrete for circular economy.
• Site inspection and quality assurance.
• Schedule and planning of construction.
• Proficiency in varied programs contain Bar Bending Schedule, RC Strengthening design with CFRP, RC design using GFRP, RC/Steel Structure, Geopolymer Concrete, RUAUMOKO, ETABS (Intermediate-Advanced), SAP2000 (Intermediate-Advanced), SAFE (Intermediate-Advanced), CSi Column, spColumn (pcaColumn), Response2000, Microsoft Excel (Advance), ADAPT-PT, Autodesk Revit Structure (Basic), AutoCAD, Microsoft Visio, GRASP, Adobe Acrobat and revu Bluebeam.
วิศวกรโยธา (วิศวกรอาวุโส, Senior Engineer)
บริษัท ช. การช่าง (ลาว) จำกัด / CH. KARNCHANG (LAO) Co., Ltd.
1 Years 1 Months
Job details
Luang Prabang Hydropower Project (LPHPP) (Luang Prabang Dam), Mekong River (North of Luang Prabang City) Luang Prabang City, Lao PDR. Regarding construction engineering works under the Carpenter Yard, Site Agent 2 (SA2) has carried out the following activities: • Carry out the fabrication formwork of overall project (NAVISGATION LOCKS/ SPILLWAY /RIGHT PIER/ POWERHOUSE/LEFT PIER/PERMANENT CAMP), including steel and Dam formwork (Doka d22) for dam site. • Carry out the fabrication and installation of “Doka d3” scaffolding, installation of vertical formwork, and dismantling of formwork for SPILLWAY (SP)-LLO1/LLO2/LLO3 (Low Level Outlet). • Carry out the fabrication and installation of temporary structures for the “PERI SCS” Climbing System Formwork, “PERI SB Frame” assembly with Type A0+A+B and installation of “Doka d3” scaffolding together with side formwork for SPILLWAY (SP)-LLO1/LLO2/LLO3 (Low Level Outlet) in the Storage Pit structures. • Carry out the fabrication and installation of temporary structures for the “PERI SCS” Climbing System Formwork, “PERI SB Frame” assembly with Type A+B, PERI SCS (Single-Sided Climbing System) 250 and installation of “Doka d3” scaffolding together with side formwork for POWERHOUSE (PH) New Unit 4 Downstream part. • Carry out the fabrication and installation of “Doka d3” scaffolding, installation of vertical formwork, and dismantling of formwork for POWERHOUSE (PH)-New Unit 4 Upstream part Orifice, Downstream part and Feeding Gallery 1. • Carry out the fabrication and dismantling of scaffolding for RIGHT PIER (RP)-Block 8, 7, 9, 10 and Draft Tube. • Carry out the dismantling the formwork of the SPILLWAY (SP)-LLO1/LLO2/LLO3 (Low Level Outlet) and Trunnion structures and POWERHOUSE (PH)-New Unit 4. • Structural analysis and design shoring for concrete slab and then use "Doka d3” scaffolding for designed for particularly tall shoring heights and high loads using the Main beam as Multi-Purpose Waling WS10 (2U-100) and Joist beam using Square hollow sections or/and "Doka beam H20 eco P/N".
วิศวกรโครงสร้าง (Structural Engineer)
Beca (Thailand) Co., Ltd. / Warnes Associates Co., Ltd. (BTCL)
6 Years 9 Months
Job details
Regarding engineering design under the 542 Civil & Structures has carried out the following activities: - MAHANAKHON KING POWER (MHNK) Project, Bangkok, Thailand. Floor Level 4, Floor Level 5, Floor Level 6 (Pool bar & Gym, Hidden bar), Floor Level 76 (Sky bar & Roof top): Assessment existing structural including floor slab, additional structure (Steel structure) and recommended maximum capacity for service loads. CANOPY: Analysis and design steel structural for CANOPY Structure this the front building MHNK hotel zone which considered existing structure with assessment members and strengthening technique to be sufficient for strength and safety according to the service loads. - RAMA III (Chaopraya) Project, Bangkok, Thailand. Analysis and design structural for Tower A the building is high-rise have 59th floor level. Considered lateral loads together with wind loads (according with DPT Standard and Wind tunnel test) and earthquake loads. - SEFIG Project, Bangkok, Thailand. Assessment existing post-tensioned slab for new live loads requirement. - KERRY Project, Bangkok, Thailand. Assessment existing structural floor slab and conception new loads requirement and design new stair steel structural. - Nimit Langsuan Project, Bangkok, Thailand. Analysis and design the flat slab system on ground floor, 2nd - 9th floor level and staircase for a top splendid residential freehold development with 53 story is centrally located on Langsuan Road and within walking distance to Lumpini Park.
วิศวกรออกแบบโครงสร้าง (Structural Design Engineer)
SKHAI International Co., Ltd.
1 Years 7 Months
Job details
- Sunrise Park Project (Sunrise Park Samui Co., Ltd.), Samui, Surat-thanee, Thailand. Analysis-design structural building (Low-rise building), cad drawing and consultant. - Sunrise Residence Samui Project (Sunrise Residence Samui Co., Ltd.), Samui, Surat-thanee, Thailand. Analysis-design structural building (Low-rise building), cad drawing and consultant. - Sunrise Garden Project (Sunrise Garden Phuket Co., Ltd.), Thalang (Cheag-thalay), Phuket, Thailand. Consultant, recheck shop drawing and inspection for building structure. - Sunrise Palm Project (Sunrise Palm Phuket Co., Ltd.), Thalang (Cheag-thalay), Phuket, Thailand. Consultant, recheck shop drawing and inspection for building and retaining wall structure. Job interview for Structural design engineer, QS engineer and Supervisor position.
วิศวกรโครงสร้าง (Structural Engineer)
International Engineering Consultant Co., Ltd. (IEC)
6 Months
Job details
- High Rise Building Project, Bangkok, Thailand. Reviewed visual, Scanning rebar, Coring concrete and UPV. Furthermore, Advance analyses wind loads and earthquake loads, likewise, checked demand capacity ratio (DCR) for building post tension slab of 22nd floor of building and car park of building 2 floor level. - SPARROW APPARELS Co., Ltd. Project, Gazipur, Bangladesh. Advanced analysis and designed wind load and earthquake loads checked demand capacity ratio (DCR) for sewing industrial building (BLD. 1) and office building (BLD.2). Considering including advanced wind loads and earthquake loads (BNBC/Alliance/ASCE/ACI Code) using ETABS & spColumn (pca Column) model. - TRC New Boiler Plant (Thai Rayon Co., Ltd.) Project, Angthong, Thailand. Advanced analysis and designed wind load and earthquake load for the Boiler building, Conveyor FDN, and Coal storage bin FDN and New ash silo FDN. Considering including advanced wind loads and earthquake loads (ASCE/ACI/DPT (มยผ.) CODE) using ETABS & SAFE model.
วิศวกรโยธา (Civil Engineer)
บริษัท อิตาเลียนไทย ดีเวล๊อปเมนต์ จำกัด (มหาชน) / Italian-Thai Development Public Co., Ltd. (ITD)
1 Years 6 Months
Job details
- RRC Upgrading Project: RRC/ARC/ptt AR, Maptaphut Industrials Estate, Maptaphut, Rayong, Thailand. Scheduled and planned for building construction and inspected the site construction to reassure the quality of civil work structure, especially: Bund Wall, Box Culvert, Local Support, Pipe Sleeper, Pipe Foundation, Radiation Shield, Pavement, Ditch and Road Work. - Civil and building work for PTT PE Ethane Cracker Project: PTT PE Ethane Cracker Project (ptt PE) 1000 Kmta Ethylene Plant, Phadeang Industrials Estate, Maptaphut, Rayong, Thailand. Scheduled and planned for building construction and also inspected the site construction to reassure the quality of civil work structure, specially: Pipe Rack and Pipe. Sleeper. - Overall Civil work and site preparation for PTT Phenol Project: PTT Phenol Plant Project (ptt PHENOL), Hemaraj Eastern Industrials Estate, Maptaphut, Rayong, Thailand. Scheduled, planned and Bar Bending Schedule for building construction along with inspected the site construction to reassure the quality of civil work structure, specifically: Pit, Pipe Rack, Tankage Foundation, Equipment Foundation, Dike, Fire wall, Pipe Trench, Cable Trench, Pipe Stanchion, Pipe Foundation, Pump Foundation, Ditch, Fence, Oper Platf, Road Work, Pavement and Grass seeding.
วิศวกรโครงสร้าง (Structural Engineer)
Civil Park International Co., Ltd. (CPI)
2 Years 1 Months
Job details
- Mahanakhorn High Rise Building Project (Highest of Thailand 73 Floor), Bangkok, Thailand. Design slab car park, stair building & Building Modeling Information (BIM) using Autodesk Revit Structure. - S-Sense Townhome Project: Bangkok, Thailand. Building design: Bearing wall & Beam column system, Roof, Slab & Building Modeling Information (BIM) using Autodesk Revit Structure, AutoCAD, ETABS, SAP2000 & SAFE model.
วิทยาลัยเทคนิคสุรินทร์
Academic year (AD)
2001
Type
Vocational education level
Level
Vocational Certificate (ปวช.)
Faculty
วิชาการก่อสร้าง
Major
ช่างก่อสร้าง
มหาวิทยาลัยเทคโนโลยีพระจอมเกล้าพระนครเหนือ
Academic year (AD)
2006
Type
Higher education level
Level
Bachelor's Degree
Faculty
วิทยาลัยเทคโนโลยีอุตสาหกรรม
Major
เทคโนโลยีวิศวกรรมโยธา
Sripatum University
Academic year (AD)
2026
Type
Higher education level
Level
Master's Degree
Faculty
คณะวิศวกรรมศาสตร์
Major
วิศวกรรมโยธา (แขนงวิศวกรรมโครงสร้าง)
Professional skills
Software skills
Language skills
Language proficiency tests
English
University tests
Asian language tests
Automotive and driving
Interests (hobbies)
Strengths and personal attributes
Be punctual.
Have determination and responsibility towards duties
Be honest
Able to work as a team
Be creative
Work well under pressure
Have self-confidence
Dare to express yourself
Decisive decision
Compassion / Empathy
Curiosity
Have self-discipline
Have patience
Kindness, gentleness
Flexibility, adaptability
การออกแบบอาคารโรงงานอุตสาหกรรมและคลังสินค้า รุ่นที่ 2
สมาคมวิศวกรโครงสร้างแห่งประเทศไทย
1 Days
เทคนิคการออกแบบก่อสร้าง และควบคุมงานโครงสร้างกำแพงกั้นดิน
สมาคมวิศวกรโครงสร้างแห่งประเทศไทย (TSEA)
1 Days
Segmental box girder construction
สมาคมวิศวกรโครงสร้างแห่งประเทศไทย (TSEA)
1 Days
การแก้ปัญหาวิกฤตน้ำท่วม
สมาคมวิศวกรโครงสร้างแห่งประเทศไทย (TSEA)
1 Days
เตรียมความพร้อม เพื่อรองรับเกณฑ์การสอบเลื่อนระดับใหม่
สมาคมวิศวกรโครงสร้างแห่งประเทศไทย (TSEA)
1 Days
การออกแบบโครงสร้างอาคารด้วยวิธีวิเคราะห์การตอบสนองไม่เชิงเส้นแบบประวัติเวลา
สมาคมวิศวกรโครงสร้างแห่งประเทศไทย (TSEA)
1 Days
การออกแบบอาคารโรงงานอุตสาหกรรม และคลังสินค้า
สมาคมวิศวกรโครงสร้างแห่งประเทศไทย (TSEA)
1 Days
พฤติกรรมการวิบัติของโครงสร้างเมื่อเกิดเพลิงไหม้
สมาคมวิศวกรโครงสร้างแห่งประเทศไทย (TSEA)
1 Days
Boring Log สู่การคำนวณกำลังรับน้ำหนักของเสาเข็ม สำหรับ วิศวกรโครงสร้าง
สมาคมวิศวกรโครงสร้างไทย
1 Days
การออกแบบฐานรากรองรับเครื่องจักร
สมาคมวิศวกรโครงสร้างไทย
1 Days
การออกแบบโครงสร้างเหล็กกับงานสถาปัตยกรรม
สมาคมวิศวกรโครงสร้างไทย
1 Days
ทบทวนความรู้การออกแบบคอนกรีตเสริมเหล็ก
สมาคมวิศวกรโครงสร้างไทย
1 Days
เทคนิคการซ่อมแซมโครงสร้างด้วยเคมีภัณฑ์
สมาคมวิศวกรโครงสร้างไทย
1 Days
การจัดรายละเอียดการเสริมเหล็กให้มีความเหนียวและรูปทรงโครงสร้างตามประกาศกระทรวงทหาดไทย
สมาคมวิศวกรโครงสร้างไทย
1 Days
การคำนวณแรงแผ่นดินไหวด้วยวิธีแรงสถิตย์เทียบเท่า ตามประกาศกระทรวงมหาดไทย
สมาคมวิศวกรโครงสร้างไทย
1 Days
การควบคุมคุณภาพคอนกรีตก่อสร้างสำหรับผู้ควบคุมงาน รุ่นที่ 2
สมาคมคอนกรีตแห่งประเทศไทย
2 Days
การเตรียมความพร้อมขอเลื่อนระดับสามัญวิศวกร
สมาคมวิศวกรโครงสร้างไทย
1 Days
แนวทางการตรวจสอบอาคารหลังน้ำท่วม และการตรวจสอบโครงสร้างอาคารเก่า
สมาคมวิศวกรโครงสร้างไทย
1 Days
การออกแบบอาคารโครงสร้างเหล็กรูปพรรณ เพื่อรับแรงแผ่นดินไหว
สมาคมวิศวกรโครงสร้างไทย
1 Days
เจาะลึกกฎกระทรวงฯ แผ่นดินไหว ฉบับล่าสุดปี 2564
สมาคมวิศวกรโครงสร้างไทย
1 Days
การเตรียมความพร้อมความรู้ด้านจรรยาบรรณ สำหรับเปลี่ยนระดับสามัญและวุฒิวิศวกรทุกสาขา
สมาคมวิศวกรโครงสร้างไทย
1 Days
การออกแบบสะพานคอนกรีตเสริมเหล็กและคอนกรีตอัดแรง
สมาคมวิศวกรโครงสร้างไทย
1 Days
การเตรียมความพร้อมขอเลื่อนระดับสามัญวิศวกร วิศวกรรมโยธา รุ่นพิเศษ
สมาคมวิศวกรโครงสร้างไทย
1 Days
การเตรียมความพร้อมขอเลื่อนระดับวุฒิวิศวกร วิศวกรรมโยธา
สมาคมวิศวกรโครงสร้างไทย (ประเทศไทย)
1 Days
การวิเคราะห์โครงสร้างด้วยวิธีระเบียบไฟไนต์เอลิเมนต์โดยโปรแกรม Ansys Warkbench เบื้องต้น รุ่นที่ 1
ตั้มซีวิลดอทคอม เทรนนิ่ง เซ็นเตอร์ (ประเทศไทย)
2 Days
การออกแบบสะพานและการประยุกต์ใช้ MIDAS Civil ในการออกแบบสะพานเบื้องต้น รุ่นที่ 1
ตั้มซีวิลดอทคอม เทรนนิ่ง เซ็นเตอร์ (ประเทศไทย)
2 Days
Training-related Software
Midas Civil
เจ้าหน้าที่ความปลอดภัยในการทำงาน
บริษัท อิตาเลียนไทย ดีเวล๊อปเมนต์ จำกัด (มหาชน) (ประเทศไทย)
1 Days
การวิเคราะห์และออกแบบโครงสร้างด้วยโปรแกรม SAP2000 รุ่นที่ 3
ตั้มซีวิลดอทคอม เทรนนิ่ง เซ็นเตอร์ (ประเทศไทย)
2 Days
Training-related Software
SAP2000
การออกแบบโครงสร้างคอนกรีตเสริมเหล็กโดยวิธีกำลัง และวิธีกำลังรับแรงแผ่นดินไหว รุ่นที่ 6
ตั้มซีวิลดอทคอม เทรนนิ่ง เซ็นเตอร์ (ประเทศไทย)
3 Days
การประยุกต์ใช้โปรแกรม TEKLA ในงานด้านวิศวกรรมโยธา รุ่นที่ 1
บริษัท รีแฮบ (ประเทศไทย) จำกัด
1 Days
Training-related Software
Tekla
การวิเคราะห์และออกแบบโครงสร้างโดย STAAD.Pro V8i รุ่นที่ 1
บริษัท รีแฮบ (ประเทศไทย) จำกัด
1 Days
Training-related Software
Staad.Pro
การออกแบบอาคารสูง อาคารขนาดใหญ่ และอาคารต้านแผ่นดินไหว รุ่นที่ 8
ตั้มซีวิลดอทคอม เทรนนิ่ง เซ็นเตอร์ (ประเทศไทย)
2 Days
การประยุกต์ใช้โปรแกรม ETABS (2013) เพื่อการออกแบบอย่างมืออาชีพ รุ่นที่ 6
ตั้มซีวิลดอทคอม เทรนนิ่ง เซ็นเตอร์ (ประเทศไทย)
2 Days
Training-related Software
ETABS
การวิเคราะห์โครงสร้างด้วยซอฟต์แวร์ และการออกแบบพื้นไร้คาน
บริษัท ซีวิลเอ็นจิเนียริ่ง คอนซัลแตนท์แอนด์เทรนนิ่ง จำกัด (CECT)
1 Days
การประยุกต์ใชงานโปรแกรม ETABS (ระดับต้น-กลาง) อย่างมืออาชีพ รุ่นที่ 4
ตั้มซีวิลดอทคอม เทรนนิ่ง เซ็นเตอร์ (ประเทศไทย)
2 Days
Training-related Software
ETABS
การใช้งาน Firework MX เบื้องต้น การสร้างป้ายโฆษณา (Banner) ปุ่มกด (Rollover) ตัวอักษร (Text) และเว็บเพจ (Webpage)
ภาควิชาครุศาสตร์ไฟฟ้า คณะครุศาสตร์อุตสาหกรรม สถาบันเทคโนโลยีพระจอมเกล้าพระนครเหนือ (สจพ.)
1 Days
Training-related Software
Adobe Fireworks
การใช้งานโปรแกรม FLASH MX, การสร้างภาพเคลื่อนไหว
ภาควิชาครุศาสตร์ไฟฟ้า คณะครุศาสตร์อุตสาหกรรม สถาบันเทคโนโลยีพระจอมเกล้าพระนครเหนือ (สจพ.)
1 Days
Training-related Software
Adobe Flash
การเขียนแบบด้วยคอมพิวเตอร์
วิทยาลัยเทคนิคสุรินทร์
23 Days
Training-related Software
AUTODESK AutoCAD
วิชาชีพระยะสั้น สาขาคอมพิวเตอร์เบื้องต้น
วิทยาลัยเทคนิคสุรินทร์
12 Days
Training-related Software
MS Office
วิชาชีพระยะสั้น สาขาการขับรถยนต์
วิทยาลัยเทคนิคสุรินทร์
12 Days
ผ่านการทดสอบมาตรฐานฝีมือแรงงานแห่งชาติ สาขาอาชีพ ช่างฉาบปูน ชั้น 1
ศูนย์พัฒนาฝีมือแรงงานจังหวัดสุรินทร์ กรมพัฒนาฝีมือแรงงงาน
1 Days
วินัยอุตสาหกรรม
กรมการจัดหางาน กระทรวงแรงงานและสวัสดิการสังคม
1 Days
No articles yet
This user has not published any articles yet.